Tully Construction
Project Status
Category
Owner / Agency
Metropolitan Transit Authority contracted Tully to remove and dispose of existing rail (running rail, third rail and attachments), contaminated components, contaminated materials including timber ties and track ballast, lead and...
projects

Houston Street

Featured
Roadwork

From 2005 to 2008, Tully performed a multi phase reconstruction of Houston Street. This project encompasses 18 city blocks between the West Side Highway and Bowery Street. Included in the scope of work was the installation of a 48” trunk main, a 20” distribution main,... [+]

Columbus Circle Reconstruction

Featured Map
Roadwork

Project of the Year 2005
New York Construction

New York City DDC awarded Tully the contract for the total rehabilitation of Columbus Circle which was almost inaccessible to the public for decades and the reconstruction of the roadway around the circle to improve traffic flow allowing... [+]

St. Felix Street

Roadwork

Rehabilitation project of the year 2002

St. Felix Street was a quiet historic street in Brooklyn when a water main break caused a century worth of problems to surface. Investigation of the street condition revealed that the street had sunk as much as 2 feet in... [+]

Westside Highway Segments 2 & 4

Featured
Roadwork

In 1998, when this project was picked as Highway Project of the Year by New York Construction Magazine, the contractors on this project were cited for how well they handled the tight site condition, difficult project logistics, on a project of modest scale which improves... [+]

HOME | SERVICES | NEWS | COMPANY | CLIENTS | PROJECTS | CONTACT US | SITE MAP

TULLY CONSTRUCTION CO. INC. © 2010