Tully Construction
Project Status
Category
Owner / Agency
In February of 2003, Tully/Pegno, a joint venture was awarded a contract from NYSDOT to reconstruct the Whitestone Expressway including bridge replacement over the Flushing Creek. This includes the repair...
projects

Tully Environmental Division / Alley Pond Park Project

Featured Camera Map
Parks, Recreation, Remediation

Tully Environmental was contracted by New York City Dept. of Environmental Protection, to restore the wetlands at the Alley Pond Park property in Douglaston, New York. The work includes the environmental restoration of the disturbed upland areas along with the recreation of a marine estuary... [+]

Randalls Island Sports Field Development

Parks, Recreation, Remediation

Randalls and Ward’s Island Park is 480 acres located between the East River, Northern Manhattan, the South Bronx and Astoria, Queens and in the shadow of the Triborough Bridge. NYC developed this park to meet recreational needs for the citizens of New York City.... [+]

Environmental Remediation Division / Tully Environmnetal TEI / East Yard at Grand Central Terminal

Featured
Parks, Recreation, Remediation

Metropolitan Transit Authority contracted Tully to remove and dispose of existing rail (running rail, third rail and attachments), contaminated components, contaminated materials including timber ties and track ballast, lead and asbestos abatement and miscellaneous waste within the limits of this project.

TEI transported the material to... [+]

The Hudson River Park

Featured Map
Parks, Recreation, Remediation

The project located in Manhattan is the first piece of a new 380 million park that will ultimately become the second largest in Manhattan. The contract area extended from the north edge of Pier 40 at Clarkson Street to approximately the centerline of Horatio... [+]

HOME | SERVICES | NEWS | COMPANY | CLIENTS | PROJECTS | CONTACT US | SITE MAP

TULLY CONSTRUCTION CO. INC. © 2010