Tully Construction
projects

JFK International Airport- Taxiway Extension and Taxiway Holding Pad

Featured
Airport

The Port Authority of NY & NJ (PANY) contracted Tully to add essential taxiway and runways in this multi-phase plan. The project location encompasses two separate areas at opposite ends of runway approximately 2 miles apart. This project has been fast tracked by the... [+]

Tully Environmental Division / Alley Pond Park Project

Featured Camera Map
Parks, Recreation, Remediation

Tully Environmental was contracted by New York City Dept. of Environmental Protection, to restore the wetlands at the Alley Pond Park property in Douglaston, New York. The work includes the environmental restoration of the disturbed upland areas along with the recreation of a marine estuary... [+]

Croton Water Treatment Plant

Featured
Treatment Plants

NYC Dept of Environmental Protection

Skanska Northeast in a Joint Venture with Tully Construction Company (“Skanska/Tully”), was awarded the contract for the Croton Water Treatment Facility.

The Croton Water Treatment Plant is set to be one of the main facilities to supply 10 percent of New York... [+]

Randalls Island Sports Field Development

Parks, Recreation, Remediation

Randalls and Ward’s Island Park is 480 acres located between the East River, Northern Manhattan, the South Bronx and Astoria, Queens and in the shadow of the Triborough Bridge. NYC developed this park to meet recreational needs for the citizens of New York City.... [+]

8th Avenue Tunnel Structural & Electrical Rehabilitation

Bridges & Tunnels

Tully Construction performed the rehabilitation of the subway tunnel on the 8th Avenue “A” train line, dating back to 1932. This subway line is 31 miles long and runs from 207th Street in Manhattan to Far Rockaway in Queens, the longest subway line with no... [+]

Final Cover and Related Work at Section 6/7, Fresh Kills Landfill Staten Island, NY

Featured Map
Landfills

In 2006, Tully Construction Co., Inc. was awarded a contract with the Department of Sanitation, NYC, (DSNY) for a project value of nearly $186 million, with a completion date in 2012. This landfill closure project consists of four (4) phases of major construction, each... [+]

JORALEMON TUNNEL

Featured
Bridges & Tunnels

The structural rehabilitation of the Joralemon Tunnel, from Bowling Greene Station (Lexington Line in Manhattan) to the Nevins Street Station (Eastern Parkway Line in Brooklyn). The Tunnel is the oldest in the transit system. It is over 2.5 miles long with the majority... [+]

Roslyn Viaduct

Featured
Bridges & Tunnels

In 2005, Tully was awarded the contract to replace the ½ mile Roslyn Viaduct on NYS Route 25A, which spans over Hempstead Harbor in Nassau County. The Roslyn Viaduct is a state-of-the-art bridge project and the first its type being built in NYS. The... [+]

Houston Street

Featured
Roadwork

From 2005 to 2008, Tully performed a multi phase reconstruction of Houston Street. This project encompasses 18 city blocks between the West Side Highway and Bowery Street. Included in the scope of work was the installation of a 48” trunk main, a 20” distribution main,... [+]

Environmental Remediation Division / Tully Environmnetal TEI / East Yard at Grand Central Terminal

Featured
Parks, Recreation, Remediation

Metropolitan Transit Authority contracted Tully to remove and dispose of existing rail (running rail, third rail and attachments), contaminated components, contaminated materials including timber ties and track ballast, lead and asbestos abatement and miscellaneous waste within the limits of this project.

TEI transported the material to... [+]

HOME | SERVICES | NEWS | COMPANY | CLIENTS | PROJECTS | CONTACT US | SITE MAP

TULLY CONSTRUCTION CO. INC. © 2010